Supplying garage equipment to our

customers nationwide for over 30 Years

01375 893858

Categories

Liftmaster 7ATLEB-PIT Class VII ATL Pit Package View full size

Liftmaster 7ATLEB-PIT Class VII ATL Pit Package

Liftmaster 7ATLEB-PIT  Complete Class VII ATL Pit Package with Emissions and all Accessories. Delivered and installed on a prepared site to DVSA spec.We can supply,install and finance prefabricated pits. 2 years warranty (2 years calibrations on emissions)

£27,553.00+vat             Lease finance example 1+59 months at £638.70+vat

More details

Add to cart


Liftmaster 7ATLEB-PIT  Complete Class VII ATL Pit Package with Emissions and All accessories

We arrange site visits, produce drawings for submission to DVSA and assist with their application forms. We can supply,install and finance prefabricated pits. the steel pits are installed with lighting, compressed air 

ATL Pit  Package includes:-

  • Computerised Roller Brake Tester with axle weighing infra red control
  • Hydraulic Play Detectors
  • Head Lamp Beam Tester.
  • Radius Plates
  • Hydraulic Jacking Beam
  • Integrated 4 gas Analyser & Diesel Smoke meter
  • Accessory Pack to include Signs, charts, tools & board, electronic brake meter,
  • notice board etc.
  • 2012 Compliance : Tool Board with Trailer Socket Tester and Leak Detector Aerosol
  • Pit frame for the brake tester
  • Mirrors and brake applicator
  • Delivered and installed on a prepared site with full warranty.
  • All calibrated, manuals and all certification supplied.
  • 2 years warranty
  • 2 years calibrations on the emissions

Liftmaster 7ATLLEB-PIT Class VII ATL Pit Package             

£27,553.00+vat             Lease finance example 1+59 months at £638.70+vat

To supply a Class VII ATL Steel Vehicle Inspection Pit with 4 x zone2 lights and an airline with 2 PCL Standard couplings.

Complete Groundworks to install 7ATL-PIT Class 7 Pit, Service Ducts & Brake Tester Pit Frame Cassette. To cut of the floor, excavate and remove spoils from site

To supply and pour all concrete and float the floor around the pit.

P.O.A

( The price excludes delivery of the pit to site and unloading costs).