Supplying garage equipment to our

customers nationwide for over 30 Years

01375 893858

Categories

Liftmaster  4ATLEF446B View full size

Liftmaster 4ATLEF446B

Liftmaster 4ATLEF446B  Class IV ATL  Automated Test Lane Complete Package. With emissions and all the accessories required by DVSA. Delivered, installed on a prepared site and commissioned with 2 years full warranty and 1 years calibrations

£31,478.00+vat      Lease finance example:- 1+59 months at £729.66+vat

More details

Add to cart

Liftmaster  4ATLEF446B Automated Test Lane Complete Package consisting

of:-

Package consisting of:-

  • 4 tonne 4 Post Lift, 4460mm platforms
  • Equipped with radius plates, hydraulic play detector plates, inspection lamp
  • 2.0t Hydraulic Jacking Beam
  • Roller Brake Tester complete with Axle weighing
  • Console with Windows based PC
  • 22” Colour monitor
  • A4 Printer
  • Installation frame for the brake tester
  • Headlamp Beam Tester
  • Elite Stand Alone 4 Gas Analyser & Diesel Smoke Meter
  • Mirrors
  • Accelerator Rod
  • Full Accessory Pack, tools & board, notice board, signs, charts, electronic brake meter. trailer socket tester etc.
  • 24 months full manufacturer’s warranty.
  • 12 months calibrations
  • All delivered, installed, calibrated and commissioned.
  • All calibration, load and level certificates, manuals and type approval documents are provided.
  • Exclusions :- All electrical supply and final connections to the equipment are excluded
  • Electrical requirements.    Lift 415v / 3ph / 20amp +E+N.   Brake tester 415v / 3ph / 30amps “C” dated fuses +E+N
  • Compressed air supply required

Liftmaster 4ATLEF446B Package with 4 tonne Four Post Lift, 4460mm with 2 years full warranty and 3 years calibrations

£31,478.00+vat      Lease finance example:- 1+59 months at £729.66+vat

Civil Works Option.

To fabricate mild steel galvanized shuttering to form the lift recess, to manufacture brake tester sump, free issue frame and deliver to site. To mark out, saw cut, break out and excavate to form the lift recess and brake tester sump. Dispose of the non-contaminated concrete and spoil. Form a concrete base to lift recess dimensions, fit reinforcing, supply and pour concrete as required. Fit shuttering and secure to the base, fit brake tester sump and level to existing floor. Drill and dowel existing floor around lift recess and brake tester sump, provide and pour concrete around the shuttering and sump and level off to existing floor with steel float finish. Remove all temporary supports and remove all equipment from site.

P.O.A.